, January 11, Asia-Plus - Russian open joint-stock company (OJSC) “Siloviye Mashiny” (power-machines) should manufacture and supply hydro generators and other equipment for the first three energy block with capacity of 167.5 megawatt of Sangtuda-1 hydropower plant being constructed in
The source in the Tajik Ministry of Energy has told Asia-Plus that the “Siloviye Mashiny” won a tender for supply of the main energy equipment for Sangtuda-1 power plant.
Russian news agency “Biznes Novosti” reports a total cost of the contract is US$80 million. Besides “Siloviye Mashiny”, “Alstom” (France-Poland) and Elsib (Russian city of
Russian concern “Siloviye Mashiny” is a leading Russian producer and supplier of equipment for hydroelectric, thermoelectric and atomic power stations, as well as transport and railways equipment. Equipment produced by the concern’s enterprises has been installed in 87 countries across the world.
Emomali Rahmon holds a meeting to discuss ways to mitigate effects of recent natural disasters
Tajik authorities sign deal to modernize the aluminum smelter, the country’s largest industrial enterprise
The price of urea has reportedly halved in Tajikistan
Russian MP proposes to equate Diasporas with foreign agents
Emomali Rahmon extends condolences to Iran’s Supreme Leader and First Vice-President
At least eight countries reportedly declare national mourning for Iranian president and foreign minister
EBRD provides loan to Tajikistan for construction of a two-level traffic intersection in Dushanbe
Job Vacancy
The share of optimistic consumers reportedly increasing in Tajikistan
Tajikistan and Russian expected to jointly produce medicines
All news
Авторизуйтесь, пожалуйста