KHUJAND, January 24, Asia-Plus - A machinery-assembling plant in the Tajik northern city of
The plant director Shavkat Bobojonov told Asia-Plus this today morning. He noted that at present the main contractor to the plants’ output were enterprises in the
In 2005, the plant produced 677,474 Somonis’ worth of output, which is 9.9 percent more than the determined target, according to the Asia-Plus interlocutor.




Uzbekistan’s solar and wind power output reportedly hits 10 billion kWh, saving billions of cubic meters of gas
Emomali Rahmon inaugurates new factory and educational institutions in Tursunzoda
Traffic jams in Dushanbe: a result of urban planning failures
One year without Assad: what has changed in Syria
Iranian ambassador stresses deeper cooperation between Iranian and Tajik specialized institutions
Tajikistan criminalizes crypto mining with stolen electricity
Fake traffic police officers arrested in Dushanbe for extorting money from drivers
Bezhan Abdulloyev crowned 2025 China Racing Champion
Tajikistan to introduce recycling fee for imported batteries
Tajikistan and UN discuss the development of UNSDCF for 2027–2030
All news
Авторизуйтесь, пожалуйста