DUSHANBE, April 22, Asia-Plus -- The Government of India plans to provide grant for modernization of the Varzob-2 hydropower station in Tajikistan, Samandar Boboyev, the first deputy head of Barqi Tojik (Tajik electric systems) power holding, announced at a press conference in Dushanbe today.
According to him, negotiations that were recently conducted with representatives of the Indian Embassy in Dushanbe were successful. The preliminary amount of a grant to be provided for this project is some $7 million, Boboyev said.
14.76 MW Varzob-2 is one of three power plants of the Varzob Cascade (a total of more than 26 MW). Varzob Cascade hydropower stations also include also Varzob-1 (3.5 MW) and Varzob-3 (3.52 MW), which also need to be rehabilitated to increase utilization and efficiency.




Tajikistan reduces funeral benefit payments: government explains the reasons
Iran’s TPO head visits Tajikistan to strengthen industrial and commercial ties
Tajikistan and Iran decide to expand trade and economic cooperation
Taliban’s new criminal procedure code sparks criticism over discrimination and class division
Tajik athletes win two bronze medals at tournament in Kazakhstan
Tajikistan uses microwave ablation to remove liver tumors for the first time
Tajikistan: Starlink equipment registration now available on official website
How Kyrgyzstan’s No. 2 figure nearly became No. 1
Soldier dies during shooting exercises in Kazakhstan: prosecutor-general takes control of the case
A first of its kind: sales start at the exclusive Rome Residence Complex in Dushanbe
All news
Авторизуйтесь, пожалуйста